Building Control Appointment

If you wish to appoint us to carry out Building Control services on a project, please complete the following form below.

Appoint Us
Do you know your Project Reference Number?

Your Personal Details

Project Details

Is your project in Wales?

Agent/Architect Details

Principal Designer (Architect/Agent) if none, Principal Contractor is Principal Designer

Do you have a Principal Designer?

Client Details (Person Procuring the Work / Legal Owner of Building)

Are you the client?

Invoicing Details – Please confirm who should receive the invoice (complete ALL sections)

Who will receive the invoice?

Fees

Construction Cost

Principal Contractor

Do you have a Principal Contractor?
dd/mm/yy
dd/mm/yy
dd/mm/yy

OR

dd/mm/yy and description

Drainage

Drainage – Is there to be a new connection to a public sewer? (If ‘yes’ please provide a plan showing the approximate location of the new connection)
Is the building constructed over or within 3 metres of a public sewer? (New build and extensions only) *

Optional requirements

Optional requirements relate to more stringent water efficiency requirements and wheelchair accessibility and is imposed by local planning authorities but implemented through the building control system.

Has planning permission been granted for your project? *
Has a condition of planning permission imposed a requirement to limit water use to no more than 110 litres/per person/ per day? *
Has a condition of planning permission imposed a requirement in relation to Part M? (If yes, which category) *

Installation and connection of communication networks to new dwelling/s

For definitions of communication networks please refer to Approved Document R Volume 1 . 2022 Edition Appendix A

Is each dwelling to be equipped with a gigabit-ready physical infrastructure that extends from a network termination point to a distribution point? *

OR

Where a gigabit-ready physical infrastructure cannot be installed to each dwelling is a high-speed network connection to be installed? *

OR

Where a gigabit-ready or high-speed network cannot be installed is an USO-Standard connection to be installed? *

Terms of Business

I agree to your terms of business and confirm on behalf of the client that I would like you to act in your capacity of Approved Inspectors. I have made the client aware of Cook Brown Building Control Ltd being appointed. *

Please upload any drawings or plans you may have (file types accepted are pdf, txt, jpg, jpeg, png, gif, doc, docx, zip and please note each file size limit is 20MB)

Maximum file size: 20MB

How did you hear about us?

Cook Brown Building Control Ltd

Unit 4, Middle Bridge Business Park
Bristol Road
Bristol
BS20 6PN

T: 01275 848228
E: info@cookbrown.co.uk

Legals

Terms and Conditions
Privacy Policy
Cookie Policy
Client Care

X (Twitter)
LinkedIn
Instagram